JEE Main · 2023 · 25 Jan 2023 · Shift 1 · Work, Power & Energy

WhatsApp Email
An object of mass '' initially at rest on a smooth horizontal plane starts moving under the action of force . In the process of its linear motion, the angle (as shown in figure) between the direction of force and horizontal varies as , where k is a constant and x is the distance covered by the object from its initial position. The expression of kinetic energy of the object will be . The value of is .

Answer: 2

Solution

The object accelerates under the horizontal part of the force, . By the work-energy theorem the kinetic energy equals the work done from the start, . Since , this is , and comparison with gives .

JEE Main · 2023 · 25 Jan 2023 · Shift 1 · Integer answer

More JEE Main questions on Work, Power & Energy

  1. Given below are two statements:
    Statement I: An object moves from position to position under a conservative force field . The work done by the force is .
    Statement II: Any object moving from one l …
    JEE Main 2026View solution →
  2. Consider two identical metallic spheres of radius each having charge and mass . Their centers have an initial separation of . Both the spheres are given an initial speed of towards each other. The minimum value of , so that they can just touch e …
    JEE Main 2026View solution →
  3. A body of mass 2 kg is moving along x-direction such that its displacement as function of time is given by , where , an …
    JEE Main 2026View solution →
  4. In case of vertical circular motion of a particle by a thread of length r if the tension in the thread is zero at an angle 30° shown in figure, the velocity at the bottom point (A) of the circular path is (g = gravitational acceleration)
    JEE Main 2026View solution →
  5. A spherical ball of mass 2 kg falls from a height of 10 m and is brought to rest after penetrating 10 cm into sand. The average force exerted by sand on the ball is N.
    JEE Main 2026View solution →
  6. A 1 kg block subjected to two simultaneous forces N and N is moved a distance of 25 m along direction. The work done in this process is _____ J.
    JEE Main 2026View solution →